Due to the COVID-19 pandemic, disruptions to the shipping chain may occur and your order delivery may be delayed. We apologize for the inconvenience. Field-Applied Sprayed Fire-Resistive MaterialsTechnical Manual 12-B, Third Edition; Standard Practice for the Testing and Inspection of Field Applied Thin Film Intumescent Fire-Resistive Materials; an Annotated Guide - 117 Provides field inspection procedures for the testing of thin-film intumescent fire-resistive materials. Includes testing criteria for thickness measurement of applied coatings. 2014. 25 pp. Illustrated Item # 117 |
- Awci Technical Manual 12-b Pdf
- Awci Technical Manual 12-b 3rd Edition
- Awci Technical Manual 12-b
- Awci 12 B Technical Manual
Awci Technical Manual 12-b Pdf
Technical Manual 12-B Standard Practice for the Testing and Inspection of Field Applied Thin-Film by Association of the Wall and Ceiling Industry (AWCI) Paperback $49.99 Only 1 left in stock - order soon. Download Song Sochta Hoon Uska Dil Kabhi Mujhpe Aaye Toh. Technical Manual 12-B, 3rd Edition; Standard Practice for the Testing and Inspection of Field Applie AWCI on Amazon.com.FREE. shipping on qualifying offers. AWCI Technical Manual 12-A – “Standard Practice for the Testing and Inspection of Field Applied Sprayed Fire-Restive Materials; an Annotated Guide”. International Building Code – Section 1704.11 “Sprayed Fire-Resistant Materials” 2.13. Southern Building Code – Section 1709 2.14. Intumescent coating testing is conducted in accordance with AWCI Technical Manual 12-B. Firestopping Review All penetrations and joints in a fire separation are required to be sealed utilizing a cUL/ULC approved firestop design.
AWCI Technical Manual B, “Standard Practice for the Testing and Inspection of. Field Applied Thin-Film Intumescent Fire-Resistive Materials. Provides field inspection procedures for the testing of thin-film intumescent fire- resistive materials. Includes testing criteria for thickness measurement of applied . AWCI Technical Manual B, Standard Practice for the Testing and Inspection of Field Applied Thin-Film Intumescent Fire-Resistive Materials; an Annotated.
Author: | Mikalabar Zunos |
Country: | Norway |
Language: | English (Spanish) |
Genre: | Art |
Published (Last): | 19 July 2013 |
Pages: | 125 |
PDF File Size: | 17.33 Mb |
ePub File Size: | 11.47 Mb |
ISBN: | 920-3-80208-835-4 |
Downloads: | 3029 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Gardat |
Architectural Fire Protection Factory Manufacturer: Company specializing in installing the work of this section with a minimum of three years documented experience and certified by the material manufacturer. Packaged materials must bear the appropriate labels, seals and designated certification mark for fire resistive ratings.
Awci Technical Manual 12-b 3rd Edition
Interchar is primarily a spray applied material, and performs without the requirement for any reinforcement. Requests for substitutions must be made 30 days prior to submittal and contain the full name of each product, descriptive literature, testing data collected from industry consensus standard testing, data on past performance, manufacturer’s instruction for use and generic 12b.
International Paint, LLC, which is located at: This page can be found at http: Submit manufacturer’s written technnical instructions. The use of a bonding agent may also improve the bond of portland cement plaster applied over relatively slick concrete, but the literature warns that one should ensure that it is an exterior grade bonding agent because a cheaper interior grade of bonding agent may not provide adequate bond.
Technical Manual B
Approved by the factory manufactured architectural fire protection material manufacturer and applied in accordance with the topcoat manufacturer’s documented instructions. Materials must be applied in accordance with the project requirements for fire rating thickness, finish texture and color.
Upon completion of installation, all excess material, overspray and debris must technifal cleared and removed from the job site.
Each layer of portland cement plaster that is applied to the concrete should be damp-cured to prevent drying too quickly. Delete options for Application not required for project. The concrete could also have been considerably drier than the portland cement plaster when it was applied and absorbed too much of the moisture from the mix to ensure proper curing.
Where necessary, cleaning or other corrections of the surfaces to receive the factory-manufactured architectural 12- protection are the responsibility of the installer of the incompatible substrate. Architectural Fire Protection Installer: Verify awc all clip hangers, piping, ducts, equipment or other items technkcal would interfere with the installation of the factory-manufactured architectural fire protection system are not positioned or installed until installation is complete. Regional Materials- 20 percent extracted, processed and manufactured aawci Published by Construction Dimensions.
Others claim that the instructions mean that the sample beam must be tested 12 inches from the end s of the member. Protect adjacent areas from over spray of fireproofing material. The following is one example of how a mock-up on a large project might be specified. Do not commence installation of the factory manufactured architectural fire protection system until the contractor, techhnical and inspector have examined the surfaces to receive the fire protection and determined the surfaces are acceptable to receive the fire protection material.
Protect work area from windblown dust and rain. Some argue that when testing a beam, the thickness must be tested in nine locations around the beam every 12 inches. All products listed in this section must be manufactured under the appropriate follow-up service with each container bearing the certified label mark.
AWCI’s Construction Dimensions – October 2013
Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of aaci authorities having jurisdiction. Temporary protection and heat shall be maintained hechnical this minimum temperature for 24 hours before, during and 24 hours after material tecbnical.
All test results must be made available to all parties at the completion of each pre-designated area and approved prior to the application of top-coat. Provide a mock-up for evaluation of surface preparation techmical and application workmanship.
Once agreed upon in writing, it serves as a guide for the finished work. We have a problem with stucco that was applied directly over concrete that is now losing adhesion. Primer applied at the steel fabricators shop must be in accordance with the provisions of Section In other words, the concrete can’t be too slick or too dry.
If the concrete lacks sufficient “tooth” for the plaster to bond to, it can eventually fail. Structural steel and framing with reference to primer receiving fire protection materials.
Awci Technical Manual 12-b
A copy of the transport document and manufacturers conformance certificate shall be attached to the material delivery QC form.
Awci 12 B Technical Manual
Technical Manual 12-B
Submit published third party design listings for fire resistance ratings and product thickness. So, one might wonder, how many beams or other structural members per test? The factory manufactured architectural fire protection material is supplied at awic required dry film thickness in accordance with the appropriate design listing.